Location
SCOPE OF WORKS
Project name
Diaphragm Wall
Piling
Soil improvement
Drilling
Others
PDF
Hong Kong
 
KCRC East rail extension - Contract LDB 201
Station box, ventilation shafts.
PIP piles
Grouting, Jet Grouting, Soil freezing
Ground investigation, Instrumentation
Sheet piling
Hong Kong 
MTRC Kowloon Station Development Package 7, KIL 11080Circular shaft, 76mDiam. 70m deep. Slurry wall with sheet pilesShaft grouted barrettes, 105m deep Ground investigation. Pump wells. Coring.Loading test 4000T. Sheet piles. Instrumentation
Hong Kong 
CLP Cable Tunnel - Tuen Mun River CrossingSmall diameter & deep circular shafts Curtain groutGround investigation, Pumping testSheet piling
Hong Kong 
KCRC East Rail Extension - Contract LCC300 Bored piles (1.2m - 2.4m dia.)  Sonic test, Interface coring tests, Full coring tests
Hong Kong 
International Exhibition Centre at HK International Airport, Lantau Pre-bored H-piles  Pre-drilling, Proof-drillingConcrete columns, Settlement monitoring. Vibration monitoring
Hong Kong 
Training Complex for Juveniles in Tuen Mun, Contract SS L399 PIP Piles Pre-drilling, Post-drillingStatic load tests
Hong Kong 
Route 8 - Eagle's Nest Tunnel & Associated Works Contract HY/2003/02  Grouting / backfillingHorizontal Directional Drilling, 2km longHole profile survey, Packer outflow tests, Packer pressure head tests, unrestricted outflow tests
Hong Kong 
Nam Fung - Lot 58 Area 55ADiaphragm Wall (1.2m thick)   Pump tests
Hong Kong 
KCRC West Rail DB320 Shaft EDiaphragm Wall (1.2m thick) Toe grouting Pump tests, Shear pins
Hong Kong 
MTRC 601- Tseung Kwan O Hang Hau StationDiaphragm Wall (1.0m thick)
(reinforced slurry wall)
   Sheet piling
Hong Kong 
MTRC 507A - Lai King to Olympic ViaductBarrettes    
Hong Kong 
KCRC West Rail DB320 Kwai Tsing Tunnels  Grouting  
Hong Kong 
KCRC West Rail DB320 - 3 Cross Passages  Jet grouting Testing
Hong Kong 
KCRC West Rail DB320Diaphragm wall
(Fibre glass reinforcement)
    
Hong Kong 
MTRC 601- Hang Hau Station & Tunnels  Rock grouting  
Lebanon 
Saifi Housing, Rues Kanafani - Mkhalissye Plots 119-120-122Diaphragm wall Rock grouting Anchors, Bulk excavation
Australia 
New Southern Railway, International, Domestic, Mascot StationsDiaphragm wall (1.2m thick)
Barrettes
Slurry wall
 Jet grouting Pump wells
Australia 
M5 East Motorway - SydneyDiaphragm wall (1.0m & 1.2m thick)Bored piles (1.0m dia.)Ground pre-treatment Pump wells, Slurry wall
Australia 
New MetroRail City Package F, PerthDiaphragm wall (1.0m thick)
Barrettes
 Jet grouting  
Singapore 
MRT North East Line Extension - Contract 705Diaphragm wall (0.8m - 1.2m thick)    
Thailand      
Bangkok MRTA - South Section Packages C & DDiaphragm wall
5 stations+C&C
Bored piles   
France 
Anse Des RegatesCircular diaphragm wall Pressure grout  
France 
Meteor  Grouting  
Hong Kong 
Penny's Bay reclamation - Disney Land  VibrocompactionCPT 
Hong Kong 
Penny's Bay reclamation - Disney Land  Stone Columns dry methodCPT